11/11/2026 – Roofing materials have arrived, steel has gone up for the entrance and they are getting welded together.  It has been busy around here.  
10/21/2026 – The last few days Wes from Outdoor Impact and his team have been working hard filling in the holes to complete the foundation.
10/05/2026 — Heavy machinery arrived to begin construction on the Creative Lot featuring community gathering spaces, sculpture, and outdoor instruments.
09/29/2026 — Footings installed; framing completed for the stage-level north backline production closet.
09/22/2026 — Completed construction on the north side level, step-free accessible entrance sidewalk.
09/02/2026 — Mill St. Bridge project completed; ongoing parking lot excavation, interior electrical, HVAC, plumbing, and north sidewalk reconstruction.
08/06/2026 — Interior and exterior utility trenching under way; foundation depth verified at over 8 feet deep.
06/14/2026 — Interior HVAC and plumbing progress continues; local Mill St. Bridge closed for construction with detours posted.
05/26/2026 — Interior demolition nearly complete; roof shored up, old green room staircase bricked up, and water line plumbing under way.
05/18/2026 — Uncovered sealed basement staircase under former bar area; front façade cement block removed and roofline reinforced following heavy rain.
05/11/2026 — Floor removal in progress; accessible pathway established for the north entrance.
05/04/2026 — Material abatement completed ahead of two sold-out performances.
04/29/2026 — Material abatement initiated; project area fully sealed.
04/22/2026 — Gallery space bar demolition and exterior siding removal completed.
04/16/2026 — Official groundbreaking ceremony held at 12:00 PM.
04/15/2026 — Interior space gutting under way for the “Creating an Entrance” renovation.
04/13/2026 — Renovation construction officially commenced at 7:00 AM.
04/08/2026 — Construction start announced for April 13; notice issued for closure of the main parking lot and 510 Mill St. building.